CTEEP 02 - SCADA with Tablet
Year of realization: 2012
Product: Spin SCADA Action.NET
Implement a SCADA system that makes the automation of the entire substation, also assuming mimic panel function and avoiding the problem of leaving unattended operating room during a procedure on the patio with the two operators on duty.

The system to be deployed should have the same functions as a standard HMI SINOCON, prioritizing announcers screens alarms in real time to operators, through touch screen, acknowledging alarms in the same way the hives conventional alarms, with access to all the substation information, including via tablet. Thus, by moving the courtyard, the only two technical substation (NR10 – minimum 2 technicians in the field) have maintained their access. This was the first substation in Brazil using tablets as MMI.